Electrical Engineer Review and Stamp for Permit Plans in Orange County, California

If plan check in an Orange County, California city rejected or corrected your contractor-signed electrical plans, send the correction and the plan set. Same if the city requires an engineer’s seal up front, as Yorba Linda and Fullerton do. Email jerry@reddog.engineering or call (626) 428-9005.

​

Red Dog Engineering takes contractor-prepared electrical plans, corrects them, and seals them for commercial and industrial permits in Orange County, California. The work is remote and the seal is electronic. Jerry Poon, PE, a California-licensed electrical engineer (#20878), reviews every set and may require revisions before he stamps it.

​

Send the plan set as PDF, the city’s correction letter or intake rejection, and the project address and city. Incomplete is fine. You get the scope, turnaround, and fee after we review what you send. Expedited review is available; the turnaround is set in the proposal.

Have an Orange County Correction That Calls for an Electrical Engineer?

Send the PDF set, the correction letter, and the city. You get a written scope, turnaround, and fee.

​

Or email directly: jerry@reddog.engineering

Who Can Sign Electrical Plans in Orange County, California

It depends on the city: under California Business and Professions Code 6737.3 a licensed contractor may design electrical systems “for work to be performed and supervised by that contractor within the classification for which his or her license is issued,” but Yorba Linda and Fullerton require an engineer or architect on commercial submittals, so the city’s document decides. The same section adds: “Nothing in this section is intended to imply that a licensed contractor may design work which is to be installed by another person.” The statewide rule is on our Who Can Sign Electrical Plans in California page.

​

Documents that call for an engineer or architect: Fullerton and Yorba Linda. Huntington Beach’s tenant improvement correction list calls for drawings stamped and signed by a registered design professional. Tustin’s 1999 guide requires one too, with exceptions.

​

Installing contractor may sign electrical sheets: Anaheim and Irvine.

​

Preparer signs, or the document doesn’t say: Brea, Costa Mesa, Garden Grove, Lake Forest, Newport Beach, Orange, Santa Ana, and the County of Orange. There the plan checker’s correction settles it.

​

The city entries below quote each document and link it. Red Dog Engineering has permitted electrical work in Orange County cities.

electrical-engineering-15.webp

City by City: What Each Orange County Building Division’s Document Says

Anaheim Electrical Plans: Who Signs

In Anaheim, the licensed engineer or a design/build contractor may sign electrical plans. Anaheim’s Industrial/Commercial/Multi-Family Submittal Requirements (B830/B846, 2018) say: “Exception: Mechanical/ plumbing/ electrical plans may be wet-signed by the licensed engineer or a design/build contractor.” The tenant improvement handout (B806, August 2016) lists what the electrical sheets must include: “(a) Load panel schedule (b) Single line diagram.” The same submittal requirements say “Load calculations shall be prepared for electrical service greater than 200 amperes” and tell the applicant to “Provide all pertinent ‘available fault current’ (AIC) information and supporting documentation” from Anaheim Public Utilities. When the contractor who drew the electrical sheets is not installing the work, an engineer signs. Anaheim Public Utilities runs a separate service-plan process; its checklist asks the customer to “Submit your electrical service drawings … electric single line diagram and load schedules” to the assigned designer. That process is outside this service.

​

Brea Electrical Plans: Who Signs

Brea’s Plan Check Requirements page does not say who signs electrical plans. The city takes permit applications and supporting documents by email. Send the correction and the set, and the plan checker’s comment settles the question.

​

Costa Mesa Electrical Plans: Who Signs

Costa Mesa’s posted handout has the document preparer sign every sheet; it does not say who may prepare electrical plans. Costa Mesa’s Building Plan Requirements for New Commercial and Industrial Buildings (Interior Tenant Improvement) call for electrical plans showing “service panels with size and ground, subpanels, and load calculations, circuit identification of outlets, fixtures, switches, smoke detectors and panel schedule.” On signatures it requires “Wet ink signature on all documents by document preparer” and the “Name, title, registration, wet ink stamp, address and phone number of all design professionals, if any.” The handout is undated and references the 1994 UBC. The city’s submittal page now says “All applications are submitted through TESSA,” its online portal. Send the correction and the set.

​

Fullerton Electrical Plans: Who Signs

Fullerton requires an architect or engineer on plans other than cosmetic alterations, and its municipal code requires an electrical engineer at 400 amperes or more. Fullerton’s Plan Check Submittal Requirements (updated 03-02-26) say that submittals “other than those for cosmetic alterations or for wood-framed dwellings … shall be prepared by an architect or engineer registered with the State of California,” and that “Seal and signature by a California licensed architect or engineer shall be provided on all documents.” It also says “All plans must bear the signature of the person who prepares the plans, whether the person is a licensed design professional or not.” The electrical sheets must include a “Single line diagram, including wire and conduit sizes and equipment location,” “Service and feeder load calculations,” and “Lighting and power plans, including all lighting controls.” Fullerton Municipal Code 14.05.030 (Ord. 3316, 2022) says “All plans submitted requiring a connected load of 400 or greater amperes, or 600 volts to ground, or greater, shall be prepared by an Electrical Engineer registered by the State of California and each sheet shall bear his registration number, date of expiration and signature.” If your set is contractor-prepared, send it with the correction; we review, correct, and stamp it.

​

Garden Grove Electrical Plans: Who Signs

Garden Grove requires a signature or stamp on every plan it reviews, including plans a contractor prepares; its policy does not say when electrical sheets need an engineer. Garden Grove’s Signature and Stamps on Plans & Documents policy (26-018) says “Plans submitted without appropriate signatures or stamps will not be accepted for plan check review,” and that “Stamps may be applied in ink or electronically, provided the signature is an original signature.” It applies the signing requirement to “homeowners, drafters, designers, and licensed contractors preparing their own plans.” The Commercial Plan Review Submittal Guideline (02/20/24) lists structural calculations “stamped and signed by the registered design professional” and has no separate electrical item.

​

Huntington Beach Electrical Plans: Who Signs

Huntington Beach’s tenant improvement correction list calls for drawings stamped and signed, digitally, by a registered design professional. The list (2022 California Building Code – Tenant Improvements) says “Drawings and calculations shall be stamped and signed by the California Registered Design Professional,” and that “Final drawings and calculations shall be digital stamped and signed by the Registered Design Professional.” It adds: “Digital stamps and signatures must be noted as such on the plan.” The list does not name who signs electrical sheets specifically. Send the correction and the set.

​

Irvine Tenant Improvement Electrical Plans: Who Signs

In Irvine, the licensed engineer or the installing contractor signs electrical sheets. Irvine’s Commercial/Industrial Tenant Improvements page (package updated June 2025) says “Plumbing, electrical, and mechanical sheets should be signed by the licensed engineer or licensed contractor (if the contractor is doing the work),” and that “Plans should be signed by whomever prepared them.” When the contractor who drew the electrical sheets is not installing the work, an engineer signs.

​

Lake Forest Electrical Plans: Who Signs

Lake Forest has the person responsible for the project sign every sheet, and engineers and architects stamp the plans they prepare. Its Tenant Improvement Plan Requirements (1/2023) say all sheets are “to be signed by person assuming responsibility for the project” and that “Plans prepared by California-licensed professional engineers or architects shall be stamped and signed.” For plumbing, mechanical, and electrical, “Plans are required when substantial work is proposed.” Send the correction and the set.

​

Newport Beach Electrical Plans: Who Signs

Newport Beach decides through a waiver questionnaire whether a tenant improvement needs electrical plans at all. Newport Beach’s Plan Check Submittal Checklist requires electrical plans for a tenant improvement only “if required by waiver,” after the “Mechanical, Electrical, and Plumbing Questionnaire for Plan Review Waiver.” Send the questionnaire result with the set.

​

City of Orange Electrical Plans: Who Signs

The City of Orange has the person who prepared each sheet sign it. The City of Orange Tenant Improvement Plan Check List requires “Electrical Plans” under Utility Plans and, for every submittal, “All sheets signed by person responsible for their preparation.”

​

Santa Ana Commercial Electrical Plans: Who Signs

Santa Ana’s plan-check page does not say who signs electrical plans. It says “Mechanical, electrical and plumbing plans, where required, must be submitted separately.” Send the correction and the set.

​

Tustin Electrical Plans: Who Signs

Tustin’s posted guide requires an architect’s or engineer’s stamp on drawings, with exceptions for interior nonstructural work. Tustin’s User Guide for the Construction of Commercial Buildings and Tenant Improvements (June 1999) requires drawings “wet signed and stamped by an architect or engineer licensed by the State of California,” with exceptions for “non-structural store fronts, interior nonstructural alterations or additions, fixtures, cabinet work, furniture, appliances or equipment.” The electrical sheets must include a “Load panel schedule showing new and existing loads” and a “Single line diagram.” The guide is dated 1999 and cites the 1996 NEC. Tustin’s undated Submittal Requirements for Tenant Improvements say “Provide electrical single line diagram and updated panel schedule. (if applicable),” and the city now takes plans online through its Streamline Tustin portal. Send the correction and the set.

​

Yorba Linda Electrical Plans: Who Signs

Yorba Linda accepts commercial plans only when a California registered engineer or licensed architect prepared or stamped them. Yorba Linda’s Tenant Improvements Plan Check Requirements say: “Only plans prepared by or stamped and signed by a State of California Registered Engineer or Licensed Architect, will be accepted for all commercial projects.” The electrical plans must “Identify the size and location of the main and sub-panels, electrical outlets, switches, lighting fixtures, exit signs, a single line diagram, and load calculations as required.” If your set is contractor-prepared, send it with the correction; we review, correct, and stamp it.

​

County of Orange (Unincorporated) Electrical Plans: Who Signs

The County of Orange’s posted process does not say who signs electrical plans. The County’s Building Permit Plan Check Process lists “Electrical Plans” among the documents required for permit issuance and notes that “Smaller projects may not need all of the above items.” Send the correction and the set.

​

Page reviewed November 10, 2026. City documents opened October 26, 29, and 30, and November 9, 2026.

electrical-engineering-13.webp

Electrical Engineer for Orange County Tenant Improvements and Facility Work

For Orange County tenant improvements and facility work, Red Dog Engineering corrects, signs, and stamps the parts of the set a plan checker reads first: load calculations, panel schedules, the single-line diagram, feeder and overcurrent device sizing, and Title 24 lighting documentation when the scope includes lighting. The work is done remotely and the seal is electronic. Contractor-prepared sheets are the usual starting point. Jerry Poon, PE reviews them, corrects what needs correcting, and seals the set under his responsible charge. Short-circuit and coordination studies are a separate service.

​

What a seal means, what the engineer checks before sealing, and how a job runs from first email to sealed set are described on the PE review and stamping page.

​

What to Send

Send the plan set as PDF, the city’s correction letter or intake rejection, and the project address and city. Add the panel schedules, equipment data, and photos of the existing panels and nameplates if you have them. For Anaheim, include the available fault current information from Anaheim Public Utilities if you have it. An incomplete package is fine; we identify what is missing when we scope the work. Everything goes to jerry@reddog.engineering. The full checklist of inputs is on the PE review and stamping page.

​

What This Service Does Not Include

This service does not include fire alarm plans. It does not include utility service applications or utility coordination, including the Anaheim Public Utilities service-plan process. It does not include residential units. Site visits are not part of the service; the engineering is done from the drawings, photos, and data you send.

Ready to Send an Orange County Set?

Email the PDF set with the correction letter, the city, and your deadline. Tell us who prepared the drawings and whether your firm is installing.

Or email directly: jerry@reddog.engineering

FAQ

1. Who can sign electrical plans for a commercial tenant improvement in Orange County, California?

It depends on the city. B&P Code 6737.3 lets a licensed contractor design electrical systems “for work to be performed and supervised by that contractor,” but Yorba Linda and Fullerton require a California registered engineer or licensed architect on commercial submittals. The city entries above quote each document.

​

2. Can a C-10 electrical contractor sign its own electrical plans in Anaheim or Irvine?

Yes, for work it installs. Anaheim’s submittal requirements say electrical plans “may be wet-signed by the licensed engineer or a design/build contractor,” and Irvine’s tenant improvement page says electrical sheets “should be signed by the licensed engineer or licensed contractor (if the contractor is doing the work).”

​

3. Does Yorba Linda or Fullerton accept electrical plans signed only by the contractor?

No. Yorba Linda accepts only plans “prepared by or stamped and signed by a State of California Registered Engineer or Licensed Architect” for commercial projects. Fullerton requires submittals other than cosmetic alterations to “be prepared by an architect or engineer registered with the State of California.” Contractor-drawn sheets can be the starting point; the engineer reviews, corrects, and stamps the set under responsible charge.

​

4. Can a licensed electrical engineer stamp plans that a contractor drew?

Yes, when the engineer takes responsible charge. 16 CCR 404.1 requires that the engineer “makes or reviews and approves the engineering decisions,” and 16 CCR 411 requires documents sealed “in a manner such that all work can be clearly attributed to the licensee(s) in responsible charge of the work.” That is why we review and correct before sealing.

​​

5. What if the contractor who drew the electrical plans is not the one installing the work?

Then the contractor exemption does not apply. B&P Code 6737.3 says “Nothing in this section is intended to imply that a licensed contractor may design work which is to be installed by another person.” An engineer signs. The state board’s guide for city officials says “A contractor appropriately licensed by the Contractors State License Board (CSLB) may only design electrical or mechanical systems which he or she will install. An employee of the contractor may perform the installation. However, the contractor cannot subcontract the installation to another contractor.”​

​

6. Is an electronic seal accepted in Orange County cities?

State law allows it: 16 CCR 411 allows “an electronically-generated representation” of the seal and says “The signature may be applied to the documents electronically.” Huntington Beach’s tenant improvement correction list requires final drawings “digital stamped and signed,” and Costa Mesa takes all applications through its online portal. Our seal is electronic; wet-stamped originals upon request.

​

7. Do you respond to plan-check corrections after the set is sealed?

Yes. Plan-check response on the documents we prepare is included as defined in the proposal.

Get a PE Review and Stamp for Orange County Plans

Email the PDF set, the correction letter, and the utility service report if you have one, or call (626) 428-9005. Scope, turnaround, and fee follow our review of what you send.

  • Review and PE stamp of contractor-prepared electrical drawings

  • Electrical design packages when the city or GC wants an engineer’s design

  • Load calculations, panel schedules, and single-line diagrams

  • Calculations and responses for plan-check corrections

  • Remote delivery; electronic seal standard, wet stamp when a city requires it

Or email directly: jerry@reddog.engineering

About the Engineer

Red Dog Engineering is led by Jerry Poon, PE, California Electrical Engineer License #20878, with 15+ years of MEP engineering and permit-driven electrical design. He has permitted electrical work in most cities in Orange County, working remotely alongside the contractors who build it.

​

Jerry reviews every set he seals. He checks the calculations, single-line, and panel schedules against each other and against the field information your shop provides, marks what needs to change, and seals only what he has taken responsibility for. There is no stamp without a review.

​

You deal with the engineer directly, from the first email through plan-check responses, with no account manager in between.